Incremental budgeting works until last year's numbers don't

How I decide where to keep it, where to replace it, and how to switch one department at a time.

""

Summary

  • Incremental budgeting builds next year's budget from last year's budget or actual results, then adjusts the figures for known changes such as pay rises, contract renewals, and new hires.
  • Finance teams choose it because it takes far less time than rebuilding every cost, budget owners already know the routine, and existing allocations face little scrutiny.
  • Because reviews focus on the change, last year's funding split survives a change in strategy, and an expired contract can stay in the baseline for years, making ordinary spending look like savings.
  • Finance often can't challenge the baseline because no one owns the assumptions behind each line, and spreadsheets carry last year's structure forward.
  • The method suits departments where next year's revenue and costs will look like this year's. It breaks down with rapid growth and high variable costs.
  • Finance can replace it one department at a time, with zero-based budgeting where no one can explain existing costs, driver-based planning where spending moves with demand, and a named owner for every assumption.
Summarize with AI:

A department head sends back last year's budget with 4% added to every line. The submission is on time, and the formulas check out. But it still doesn't tell me whether last year's assumptions hold for next year. This is incremental budgeting.

According to the FP&A Trends Survey 2025, more than a third of finance teams use this method, relying on "last year plus x%" when planning.

I've built budgets this way as a financial analyst, and now, as a finance solutions consultant, I help finance teams rework their planning processes. I understand the appeal, especially when deadlines are tight, and in the right place, the method does its job. It works wherever last year's assumptions still hold. The trouble starts where they don't, and that line usually runs between departments, not around the whole company.

In this article, I'll explain how incremental budgeting works, why teams choose it, and where it falls short. Then I'll cover how to tell which parts of the budget can keep rolling forward and how to move the rest to zero-based or driver-based planning, one department at a time.

What is incremental budgeting in finance?

Incremental budgeting starts from last year's approved budget or its actual results, then adjusts those figures for expected changes such as salaries, supplier costs, and growth.

The two starting points aren't interchangeable. The budget shows what the business intended to spend, while actuals show what it spent. However, budgets can also include plans that never happened, and actuals can include one-time costs, so I reconcile the two before applying new assumptions.

From there, an adjustment can cut a line as easily as raise it. Because each department's share of funding carries over, the review focuses on what changed, which lets teams set spending limits quickly when operations are stable.

How the incremental budget model works

The incremental budget model runs in six steps, whether finance works in a spreadsheet or in budgeting software.

  1. Set the starting point: Take last year’s approved budget or actual results, organized by department and expense category. Remove one-time costs and plans that never happened. In a spreadsheet, this usually means copying last year’s workbook and swapping budget figures for actuals where needed.
  2. Update the assumptions: Revise salary adjustments, supplier rates, pricing, and expected sales growth. Tie each change to a specific cause, such as a vendor’s renewal quote or the planned pay rise. A flat percentage across every line is faster to apply, but reviewers can’t see why any line moved.
  3. Add and remove known changes: Add planned hires, contract renewals, and new projects. Reduce lines where contracts end or workload falls.
  4. Check the assumptions against each other: Revenue, staffing, and spending assumptions should agree with each other and with recent results. Partial-year costs are easy to miss. A mid-year hire, for example, may need a full year of funding in the next budget.
  5. Consolidate the figures: Combine department submissions, check formulas, and remove anything budgeted twice, such as a software license that both IT and the department using it included.
  6. Submit the budget for approval. Present the plan and key assumptions to leadership, address questions, and finalize allocations.

Let's look at a simple example for a customer support team that spent $1.2M last year. Each adjustment below has a documented cause, such as a vendor quote or a planned pay increase, so a reviewer can verify it.

An incremental budgeting example (illustrative figures).
LineChangeRunning total
Last year’s actuals$1,200,000
Remove a one-time system migration−$60,000$1,140,000
Fund a full year for an October hire ($70K salary)+$52,500$1,192,500
4% pay rise on the $950K full-year payroll+$38,000$1,230,500
Software renewal quoted at $92K, up from $80K+$12,000$1,242,500
Overflow outsourcing contract ends−$50,000$1,192,500
An incremental budgeting example (illustrative figures).

How does incremental budgeting differ from zero-based budgeting?

The central distinction in zero-based budgeting vs. incremental budgeting is what has to be justified. An incremental budget asks owners to explain the change from last year. Zero-based budgeting starts from zero and asks them to explain the full amount. In the support team example, an incremental review covers five adjustments. A zero-based review would also ask whether the $1.14M baseline should be there at all.

Why do finance teams choose incremental budgeting?

Finance teams choose incremental budgeting for three reasons: it's familiar, switching takes work, and it protects existing allocations.

Familiar workflows make participation easier

The advantages of incremental budgeting start with familiarity. Budget owners reuse last year’s template and already know how finance will review their requests. For a sales or operations head who spends a few weeks a year on the budget, that removes most of the effort.

An incremental budget also provides a shared reference point. Managers explain changes against previously approved allocations, while finance concentrates on significant movements and exceptions.

Switching adds work during an already-demanding budget cycle

Moving to zero-based or driver-based planning means new templates, training for budget owners, and approval criteria that leadership has signed off. It also needs data many teams don’t keep, such as what each activity costs and what each allocation is supposed to produce.

All of it lands on a cycle that is already long. The same FP&A Trends survey found that 28% of organizations take three to six months to complete the annual budget. Department heads are still running their teams through that period, and finance is still closing the books every month.

Existing allocations can be difficult to challenge

An incremental review rarely questions money that's already in the budget. That suits managers who have built a buffer into their lines, and it gives them a reason to resist any method that reviews the full amount, even when the money would do more elsewhere in the business.

Some buffers are legitimate, such as a contingency for a supplier contract that hasn’t been repriced yet. The trouble starts when a buffer is spread across ordinary lines where no reviewer can see it.

The first two reasons come down to effort, which better templates and tools can reduce. The third comes down to incentives. In any department where finance changes the method, it has to deal with those directly.

Where incremental budgeting falls short

The disadvantages of incremental budgeting come from what the review leaves out. It checks each change against last year, and it rarely checks last year against what the business needs now.

Strategic misalignment

Last year’s budget reflects last year’s priorities. Adjusting the amounts can leave funding in the same departments even after the strategy changes.

Say a software company decides retention matters more than new logos this year. Sales and marketing start from last year’s large share, and customer success starts from last year’s small one. Each team can defend its own changes, but most of the money still goes to winning new customers instead of keeping existing ones.

Inefficient resource allocation

An incremental budget can leave a department with more money than its work now requires, while a team that has taken on more work stays at last year’s level.

For example, let’s say accounts payable automates invoice matching and needs two fewer clerks. If its budget rolls forward unchanged, the money for those two roles stays in AP while FP&A is still waiting on the analyst it asked for.

Everything AP spends may still be useful. But because each department is compared only with its own past, the incremental review never asks whether AP is the best place for that money to go.

Weak accountability for the full cost

Budget owners in an incremental review explain what changed, not what the whole budget is for. In the support team example, the owner can justify the $38,000 pay rise and the $12,000 software renewal line by line. Nothing in the process asks what the full $1.19M should buy in terms of tickets resolved or response times.

Limited flexibility when the business changes

Last year’s figures say nothing about an activity the business didn’t run last year, whether that’s a new product, location, or sales channel.

A new store might need a lease deposit, set-up costs, and staff hired three months before its first sale. None of that has a prior-year line to adjust, so the method has nowhere to put it. The costs get squeezed into existing lines, approved as an exception outside the budget, or pushed to the next cycle. And because incremental adjustments work on annual totals, they can't show that the spending lands months before the revenue does.

How errors compound in an incremental budget

Rolling a budget forward treats last year's approval as proof that every line was needed. But in an incremental cycle, approval only covered that year's changes. Everything else was carried over from the year before, and the year before that.

Yesterday’s error becomes tomorrow’s baseline

Expired contracts, discontinued programs and duplicate expenses survive because no one reviews them. After a few cycles, the fact that a line was approved before starts to look like a reason to approve it again.

A percentage increase makes the error grow. An unnecessary $100,000 line becomes $105,000 after a 5% increase and $110,250 after a second one. Even with no increase, the line holds $100,000 of budget every year for something the business no longer needs, and that money could have funded another team's request.

An inflated baseline can conceal its own weakness

With incremental budgeting, spending below budget doesn't look like a problem. Most variance reviews spend their time on overruns, so an inflated baseline can pass as underspending.

In a previous job, I found five expired contracts that had been carried over into a property manager's budget for two years running. The business no longer paid them, but the budget still included them, so actual spending looked better than planned. I would question any claim of savings based on comparing actual spending with that budget.

A line that comes in under budget year after year can mean three things: the team found a real saving, planned work slipped, or the baseline is wrong. Only the last is an error, and a review that looks only at the change can't tell them apart.

Why finance struggles to review the baseline

Even when finance wants to question last year's figures, two things get in the way.

Spreadsheets reinforce the existing approach

Spreadsheets are still where budgets get built. In AFP’s 2025 FP&A Benchmarking Survey, 45% of organizations still rely primarily on spreadsheets for planning. Copying last year’s tabs and formulas is the fastest way to start a new budget, and last year’s structure comes along with it.

Actuals are often split across the ERP, the payroll system, and department trackers. Without one agreed source, finance matches reporting periods, account codes, and totals by hand. That leaves less time to check assumptions.

When each department edits its own copy of the workbook, finance can’t always tell which version holds the approved figures. Large changes are harder to track and combine across copies, which gives teams one more reason to stick with small adjustments.

Scenario planning works in a spreadsheet, but every scenario is one more copy to maintain. Moving a launch date or a hiring plan means updating every tab and file that depends on it.

Ownership gaps narrow the review

In most incremental budgets, a department head signs off on the total, but no one is assigned the assumptions underneath it. Take a facilities budget that funds 200 desks when 140 people come in on a normal day. The 200 may date back to an office plan from three years ago, and the current facilities manager may not know where it came from. When finance asks, it isn't anyone's job to find out, so the line rolls forward.

Even when someone could answer, finance needs leadership behind the question. Challenging a department head's baseline means challenging that person's control over their own spending, and an FP&A analyst rarely has the standing to push that alone.

When should you use incremental budgeting?

The answer usually varies across the business. Last year's assumptions can still hold for payroll administration and fail for a product line entering a new market, so the advantages and disadvantages of incremental budgeting have to be weighed one department at a time.

Where incremental budgeting works well

Incremental budgeting works well for companies and departments that can predict most of next year’s revenue and costs in advance with reasonable certainty.

On the revenue side, that means most of next year's income comes from existing customers buying at similar volumes and agreed prices, through long-term service agreements, supply contracts, or leases, for example.

Costs would follow the same basic pattern. Most spending would be reflected in existing commitments that run past next year, such as leases, multi-year software agreements, and salaried roles that won’t change. With little seasonality, there’s not much for the monthly split to get wrong either.

A facilities management firm with multi-year service contracts fits this well. Next year's budget mostly needs three updates: the annual price increases written into existing contracts, the planned pay rise, and any contracts that come up for renewal during the year, which may be repriced or lost.

The fit holds as long as the contract base stays steady. Winning a large contract can mean hiring staff and buying equipment before its revenue starts, and losing more customers than usual makes renewal income harder to predict. In either case, the affected part of the budget needs to be rebuilt, while the rest can keep rolling forward.

Where incremental budgeting becomes less suitable

Rapid growth is the clearest case. A company planning to grow 40% may hire sales reps and support staff months before the revenue they’re meant to handle arrives. Last year’s spending says nothing about how many people to hire or when.

Variable costs are the other case. Materials, shipping, and payment processing fees move with sales volume, product mix, and supplier prices. If volume rises and the mix shifts toward heavier products, shipping costs grow faster than sales, and no adjustment to last year’s line will show that.

How to replace incremental budgeting where it no longer fits

Start with one or two departments in the next cycle. A small pilot lets finance work out problems in the templates and instructions before every budget owner uses them, while the rest of the company budgets the way it did last year.

If the strategy changed this year, leadership should reset each department's total before any pilot starts. Owners then build their budgets within those totals. For example, a company shifting its focus to retention would give customer success a larger share up front, and sales and marketing would plan within a smaller one.

1. Choose which department(s) to start with

To figure out where to start, ask the following questions:

  1. Which departments have stable, predictable spending needs?
  2. Which departments’ costs move with sales volume, seasonality, or headcount?
  3. Where could historical padding or repeated underspending indicate excess funding?
  4. Which of the most significant costs have gone longest without review?
  5. Did the strategy change this year, and did the split between departments change with it?
  6. Can the department head give the pilot real time this cycle?

Departments that answer yes to question 1 can keep their incremental budget. Rank the rest by how clearly they answer yes to questions 3 to 5. Where two departments rank about the same, start with the one with the bigger budget. This is where a small percentage of excess will have the most impact. For example, finding 3% of excess in a $5M budget frees up $150,000, while the same 3% in a $500,000 budget only frees up $15,000.

Start with the highest-ranked department whose head can give the pilot real time this cycle (question 6). The others follow in ranked order in later cycles.

2. Choose the budgeting method based on what the questions revealed

Use zero-based budgeting when there are existing costs no one can explain. The owner rebuilds the budget from zero. Every line has to name what it pays for, whether that’s a contract, a role, or a program with a stated output, and any line that can’t be matched to one comes out.

Use driver-based planning where spending moves with something finance can forecast. The budget is built from the drivers in place of last year’s total: tickets per agent, units shipped, a store’s opening date, the month each new hire starts. When a driver changes, every line that depends on it changes too.

Departments outside the pilot keep their incremental budget this cycle, but finance should still remove one-time costs and expired commitments from their starting figures. Every department, whether participating in the pilot or not, uses the same reporting categories, deadlines, and approval rules, so all budgets combine into one company plan.

3. Choose a business budgeting tool that fixes or eliminates the problems with spreadsheets

Spreadsheets create three problems for a baseline review: actuals scattered across systems, competing workbook copies, and scenarios that each need their own file. Business budgeting tools can minimize or remove most of them, in two parts.

The first part is data, which takes care of the first two problems. When actuals from the ERP, payroll, and department trackers land in one model, and that model is the only version of the budget, finance stops matching totals by hand. That doesn't question a single cost, but it gives finance back the time to do it.

The second part is the model itself, which takes care of scenarios. A budget built from drivers instead of last year's totals shows what each line depends on. Moving a store opening from March to June or adding three hires in Q2 updates every dependent line, and finance can compare the two versions side by side.

Many business budgeting tools now handle both parts. For a department-by-department transition, four capabilities matter most: direct connections to the systems that hold actuals, one shared model instead of separate files, support for different budgeting methods within the same plan, and views that let each budget owner track their own spending.

Drivetrain, an AI-native FP&A software with business budgeting tools built in, is one example. Its pre-built connectors pull actuals from the ERP, CRM, HRIS, and billing systems into one model. That model can hold zero-based, driver-based, and hybrid budgets side by side, so a pilot department can be rebuilt while the rest roll forward and still consolidate into one company plan. Budget owners see their own budget vs. actuals and can drill into a variance down to the transaction.

Even the best tool won't close the ownership gap. It can show that facilities budgets for 200 desks when 140 people come in on a normal day, but if no one is responsible for that assumption, no one has to explain it, and the line rolls forward anyway. That's why the pilot starts by giving every assumption an owner.

4. Set up and run the pilot

In the pilot, the department head still owns the total, but each line's owner answers for what it pays for and what it should produce, such as tickets resolved per month in support.

The CFO should tell the department head directly what is changing and why, and make clear that FP&A's questions have the CFO's backing. It also helps to allow a declared contingency line. An owner who can hold a buffer in the open has less reason to hide one in ordinary lines.

Agree on how the pilot will be judged before it starts. Two measures cover most of it: how much of the baseline was cut or moved to another department, and how many extra hours finance and the owner spent getting there. If the hours outweigh what was found, the department or the method was the wrong choice.

After the cycle, ask the pilot owner and the FP&A analyst where they got stuck, such as an instruction they read two ways or data they couldn't get. Fix those in the template and training before the next department joins.

5. Extend the approach gradually

Add departments one or two per cycle, in the order the six questions ranked them. Each one joins after the last pilot’s problems are fixed in the template and only if the last pilot found enough to make the hours worth it.

Those departments with stable, predictable spending needs (the ones that answer yes to the first question in Step 1) may never need to switch to a different method.

Match the method to the business

Every incremental budget rests on one question: do last year's assumptions still hold for next year? The method doesn't require anyone to answer it, but that doesn't make it the wrong choice. Where the answer is yes, rolling the budget forward saves real time. Where the answer is no, or nobody knows, the baseline needs to be rebuilt: from zero where costs can't be explained, or from drivers where spending moves with demand.

That change doesn't have to happen all at once. Start with one or two departments, give every assumption an owner, bring the data into one model, and judge the pilot by what it found against the hours it took. With each cycle, more of the budget has been questioned by someone, and less of it has simply been carried forward.

Share article

About the author

Elise Pelechaty, CPA

Elise Pelechaty, CPA

Finance Solutions Consultant

Elise Pelechaty is a Solutions Consultant and CPA with over a decade of experience spanning public accounting, financial analysis, and FP&A software consulting. She spent over three years at EY in audit and accounting roles, followed by positions at Starlight Investments as Senior Financial Analyst, before transitioning into FP&A technology. At Drivetrain, Elise specializes in helping finance teams implement and optimize their FP&A workflows. She writes about accounting workflows, financial close processes, and how finance teams can streamline their operations with modern planning systems.

FAQs

What is incremental budgeting?

An incremental budget is next year’s plan, built by taking last year’s budget or actual results and adjusting each line for known changes, such as a pay rise or a contract that ends. The adjustments can go down as well as up. Most of the review goes to those changes, and the starting figures are largely accepted as they are.

What’s the difference between zero-based budgeting and incremental budgeting?

Incremental budgeting asks budget owners to justify the change from last year. Zero-based budgeting asks them to justify the full amount, starting from nothing. Zero-based budgeting takes longer to prepare, but of the two, it’s the only one that questions costs carried over from earlier years.

What are the advantages and disadvantages of incremental budgeting?

The main advantage is speed. Budget owners start from figures and templates they already know, so the cycle takes far less time than rebuilding every cost, and finance can spot large movements quickly. The main disadvantage is that the review covers only what changed. Funding stays split the way it was last year even after priorities shift, owners never explain what the full budget should deliver, and costs that are no longer needed can stay in the baseline for years.

How can I tell if my incremental budget is carrying costs we no longer need?

Start with lines that have come in under budget for two or more years. Match each one to a live contract, an employee or a recurring payment in the ledger. A line that matches nothing is probably an expired commitment still sitting in the baseline.

When does incremental budgeting stop working?

Usually in one part of the business before the rest. The clearest sign is a plan that depends on things last year didn't have, such as hires made months before the revenue they support. High variable costs are another, because shipping and materials can grow faster than sales when the product mix shifts. Those departments need a different method, while stable ones can keep rolling forward.

Can a company use incremental and zero-based budgeting together?

Yes. Stable departments can keep an incremental budget, as long as finance removes one-time costs and expired commitments from their starting figures. Departments with costs no one can explain can rebuild from zero. All departments should share reporting categories, deadlines, and approval rules so their budgets combine into one company plan.

How does Drivetrain help finance teams replace incremental budgeting where it no longer fits?

Drivetrain holds zero-based, driver-based, and hybrid budgets in one model, so a pilot department can be rebuilt while the rest of the company rolls forward. Actuals come in through pre-built connectors to the ERP, CRM, HRIS, and billing systems, which makes it easier to check whether a recurring line still matches a real payment. Department heads enter their inputs through budget templates and see their own budget vs. actuals, while finance controls the core model.

Become the strategic partner your business needs

Fewer spreadsheets, faster planning, better decisions.

Book a Demo